Customer Case
China Railway Second Bureau Group Xinyun Engineering Co., Ltd. Shanghai Line 14
China Railway Second Bureau Group Xinyun Engineering Co., Ltd. Shanghai Metro Line 14 Track Construction Site B
Trackless series construction equipment
The B section project of the Shanghai Metro Line 14 track construction site of China Railway Second Engineering Group Xinyun Engineering Co.,Ltd.has fully started construction,and multiple trackless series construction equipment produced by our company have been fully utilized.With new construction techniques and excellent hardware facilities,it is like crossing from the era of Nokia phones to the era of smartphones.
The era of innovation not only drives the post-10th and post-00s generations,but also the post-60s,post-70s,and post-80s generations.Classic and meticulous ideas combined with flowing and light notes create ideas,which are then put into action and implemented,resulting in a small demon king"trackless series equipment".The Little Demon King may encounter some minor issues upon arrival at the scene,but with the 81 difficulties of various immortals,he will eventually achieve the true result of cultivation.
They are currently shuttling through tunnels in Shanghai,lifting slabs,transporting slabs,transporting concrete,and so on
The introduction of new equipment also provides new professions, and our company is currently responsible for providing free training for new professions. The new operator is currently operating